Area Finalization

Area finalization involves the process of selecting and preparing the site for the installation of the power charging substation. This includes assessing factors such as accessibility, terrain, and proximity to power sources. Once a suitable location is identified, any necessary land preparation and clearance are conducted to ensure a stable foundation for the substation.

Image 1
Image 3
02

CIVIL FOUNDATION

Civil foundation work is essential for providing a stable base for the power charging substation equipment. This involves excavation, construction of concrete foundations, and installation of anchor bolts to securely support the substation structures. The foundation design must consider factors such as soil composition, load-bearing capacity, and environmental conditions to ensure long-term reliability and safety.

03

SUBSTATION MOUNTING

Substation mounting refers to the assembly and installation of the various components that comprise the power charging substation. This includes mounting the transformers, switchgear, circuit breakers, and other electrical equipment onto the prepared foundation. Skilled technicians and engineers carefully align and secure each component according to manufacturer specifications and engineering standards.

Image 5
Image 3
04

CABLE LAYING

Cable laying is a critical aspect of power charging substation installation, involving the installation of high-voltage cables to connect the substation to the power grid and charging equipment. This process requires meticulous planning and execution to ensure proper routing, insulation, and protection of the cables. Cable laying is typically carried out following safety protocols and industry best practices to minimize risks and ensure reliable power transmission.