Civil And Land Preparation

Our team begins by assessing the designated area for the installation of charging infrastructure. This involves thorough land preparation, including clearing, leveling, and ensuring the site is suitable for construction. Civil engineering expertise is employed to ensure the structural integrity of the site and its readiness for further development.

Image 1
Image 3
02

PLATFORM ERECTION

Platform erection marks a crucial phase in the installation process. Our skilled on-site supervisors and civil engineers carefully assemble and erect the necessary platforms to support the charging equipment. Precision and attention to detail are paramount to ensure stability and safety.

03

ACDB INSTALLATION

The ACDB installation is an essential component of the electrical system. Our technicians install the ACDB, which acts as a distribution point for alternating current power within the charging infrastructure. This meticulous installation ensures efficient power distribution and system functionality.

Image 5
Image 3
04

CABLE LAYING

Cable laying involves the careful installation of electrical cables to safe guard the charging equipments. Our team meticulously plans and executes cable routes, ensuring proper insulation and protection against environmental factors. Quality cables are selected to ensure reliable power transmission and longevity.

05

SHED FABRICATION

Shed fabrication involves the construction of shelters or enclosures to safe guard the charging equipments . Our skilled craftsmen fabricate sturdy and weather-resistant sheds using high-quality materials. Attention is paid to both functionality and aesthetics to provide an optimal environment for the charging infrastructure while enhancing the site's visual appeal.